Tegnatia Energy Inc. was established in 2013 through a partnership between T Dinamik Energy and Egnatia, a company based in Greece, with the aim of providing project development, turnkey EPC solutions, and long-term operation and maintenance services for medium- and large-scale solar energy projects. Since 2019, the company has continued its operations as a wholly owned subsidiary of the T Dinamik Energy Group.

Since its establishment, Tegnatia Energy has successfully completed the installation of solar power plants with a total installed capacity exceeding 600 MW for T Dinamik Energy and various investors. Among these projects, the 4.2 MWp solar power plant installed on the roof of Galatasaray Stadium (Ali Sami Yen Sports Complex Nef Stadium) has been recorded in the Guinness World Records as the highest-capacity solar power plant installed on a stadium roof.

Having pioneered numerous firsts in the field of solar power plants in Türkiye, Tegnatia Energy has completed and commissioned the country’s first floating solar power plant integrated into a hydroelectric power plant under licensed regulations.

Playing a leading role in the field of energy storage, Tegnatia Energy continues to strengthen its organizational structure and partnerships in order to deliver high-quality services to investors. In this context, the company has completed the installation of Türkiye’s first hybrid energy storage project integrated with solar and wind power plants.

Closely following innovative technologies and evolving industry trends, Tegnatia Energy continues to provide turnkey solutions for ground-mounted, rooftop, and floating solar power plants, as well as energy storage facilities.

Tegnatia in Numbers

Engineering, Procurement and Construction (EPC)

Tegnatia has realized the EPC construction of over 400 MWp solar power plants in 44 different locations in Turkey.
It has successfully performed the commissioning of Turkey’s two largest licensed SPP projects with 40 MWp  and 36 MWp capacity.

Repair and Maintenance

Throughout their guarantee period, we also provide Repair and Maintenance services for all the power plants which we have constructed as a turnkey project. These services are directed from the main office in Istanbul and regional offices.   Within the scope of Repair and Maintenance the services carried out are the 7/24 monitoring of production and failures, troubleshooting of failures and spare parts management, instant and long-term performance analysis as well as preventive and corrective maintenance.

Power Plants Generating Energy of the Future

Tegnatia Enerji is working since the year of 2013 to function as a leading EPC (Engineering, Procurement, and Construction) company in national and international markets.

Power Plants Generating Energy of the Future

Tegnatia Enerji is working since the year of 2013 to function as a leading EPC (Engineering, Procurement, and Construction) company in national and international markets.