Adana Çimento SPP 1.0 MWp
The 1 MWp Solar Power Plant, turnkey constructed for OYAK Group in the Yüreğir district of Adana province, was successfully commissioned in November 2015.
Tegnatia Enerji Üretim San. Tic. A. Ş.
Kısıklı Mh. İncir Sk. No: 6/2
34696 Üsküdar, İstanbul, Turkey
+90 216 524 12 34
+90 216 524 12 43
[email protected]
www.tegnatia.com
© Copyright 2020 - 2026 | Tegnatia | All Rights Reserved | Designed By APRON