A contract has been signed between Polat Enerji, Tegnatia, and T Dinamik for the installation of an Energy Storage System (ESS) with a capacity of 10 MW and 13.4 MWh.
This project will be the first energy storage facility in Türkiye to be integrated into wind and solar hybrid power plants. Within the scope of the project, a 10









