Isparta Uluborlu Hybrid SPP 54.9 MWp
The 54.9 MWp Solar Power Plant, turnkey constructed for Fiba in the Uluborlu district of Isparta province, was successfully commissioned in May 2024.
Tegnatia Enerji Üretim San. Tic. A. Ş.
Kısıklı Mh. İncir Sk. No: 6/2
34696 Üsküdar, İstanbul, Turkey
+90 216 524 12 34
+90 216 524 12 43
[email protected]
www.tegnatia.com
© Copyright 2020 - 2026 | Tegnatia | All Rights Reserved | Designed By APRON