Sakarya TKG Adapazarı ADP-2 SSP 1 MWp
The 1 MWp Solar Power Plant, turnkey constructed for TKG Adapazarı in the Arifiye district of Sakarya province, was successfully commissioned in February 2023.
Tegnatia Enerji Üretim San. Tic. A. Ş.
Kısıklı Mh. İncir Sk. No: 6/2
34696 Üsküdar, İstanbul, Turkey
+90 216 524 12 34
+90 216 524 12 43
[email protected]
www.tegnatia.com
© Copyright 2020 - 2026 | Tegnatia | All Rights Reserved | Designed By APRON